Customer: IT TRIGGERS.

Project: Monitoring of the Pilonos of the Quinto Centenario Bridge at a height of 110 meters.

Project Description:

EASTAV GLOBAL was contracted by ACCIONA to monitor the pylons of the Quinto Centenario Bridge. This project aimed to guarantee the stability and safety of this important structure through the accurate and efficient installation of monitoring prisms.

https://www.youtube.com/watch?v=drB0A8eDEy0&t=2s

Challenges

  • Complicated Access: The bridge's pillars are difficult and dangerous to access due to their height and design.
  • Weather Conditions: Working at high altitude exposes technicians to adverse weather conditions that can change rapidly.
  • Need for Speed and Accuracy: The installation of prisms should be quick to minimize exposure time to risks and accurate to ensure the accuracy of the monitoring data.
Construction worker on scaffolding with safety equipment on wooden building frame

Implemented Solutions.

  • Access via Artificial Climbing:
    • Technique Used: Artificial climbing was used with the placement of removable Pulse anchors, allowing safe and controlled access to the pylons.
    • Anchor Specification: Pulse removable anchors were selected for their reliability and ease of installation and removal, minimizing impact on the bridge structure.
  • Rope Rope Installation:
    • From the Upper Area: Rope lines were installed from the top of the pylons, facilitating access to all their faces.
    • Prism location: The prisms were strategically placed a few centimeters from the edge of the pylons to maximize monitoring accuracy.
  • Installation with Impact Gun:
    • Speed and Efficiency: The use of an impact gun allowed a quick and safe placement of the anchors that fix the prisms to the structure.
  • Additional Security Measures:
    • Temporary Horizontal Lifelines: To increase the safety of technicians, temporary horizontal lifelines were installed.
    • Battery descender: Battery descenders were used, making it easier for technicians to climb safely, quickly and comfortably.
Industrial workers rappelling down concrete structure against clear blue sky

Conclusion

The success of this project reinforces EASTAV GLOBAL's commitment to excellence and safety in all its work. Our ability to adapt to challenging conditions and use advanced technologies positions us as leaders in the field of structural monitoring.

Rock climber rappels down tall brown building with expansive landscape view below.

Do you want us to take care of your case?

Contact our team and we will advise you to give you the best solutions

The product

Structural Monitoring on the Quinto Centenario Bridge

image gallery

No items found.

Train yourself for the most popular technical profiles

IRATA, GWO training and certified professional courses to access qualified, safe and recognized jobs in work at height and industry.

Climber's gloved hand holding red and blue climbing rope with carabiner
No items found.
EASTAV selection

Related professional teams

Certified material used and recommended by our technicians.

No items found.
Structural Monitoring on the Quinto Centenario Bridge

No items found.

Join our adventure, let's stay connected!

Join our community through our newsletter and social media!

By subscribing, you accept our
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.